Florida / Economic data / Building permits / Madison
Madison County residential building permits
Housing units, buildings and construction value authorized by building permits in Madison County and each of its 3 permit issuing places, from the US Census Bureau Building Permits Survey. The county is the sum of its places. Consumer spending in Madison County.
Places in Madison County, latest figures
Sort any column; select a place to open its card. A county permit office issues permits for the unincorporated area, or for the whole county where no city issues its own.
| Area | Type | Latest month | Units, last 12 months | Change | One unit | Five or more | Value, last 12 months | Annual table | Units that year |
|---|---|---|---|---|---|---|---|---|---|
| Madison County | County permit office | Aug 2026 | 42 | +5.0% | 40 | 0 | $20,267,523 | 2025 | 39 |
| Lee town | Municipality | Dec 2004 | 2 | -50.0% | 2 | 0 | $196,900 | 2016 | 0 |
| Madison | Municipality | Dec 2014 | 0 | n/a | 0 | 0 | $0 | 2020 | 0 |
County and places
Madison CountyCounty total12 months to Aug 2026: 42 units, +5.0%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 4 |
| Units, 12 months to Aug 2026 | 42 |
| Change on the 12 months before | +5.0% |
| Of which one unit buildings | 40 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $20,267,523 |
| Change in value | +71.6% |
| Units, annual table, 2025 | 39 |
| Change on 2024 | +30.0% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only |
|---|---|---|---|---|---|
| 2025 | 39 | 39 | 0 | $12,007,851 | 39 |
| 2024 | 30 | 28 | 0 | $7,381,675 | 30 |
| 2023 | 31 | 31 | 0 | $8,167,610 | 31 |
| 2022 | 52 | 52 | 0 | $13,138,320 | 52 |
| 2021 | 52 | 52 | 0 | $10,618,140 | 0 |
| 2020 | 43 | 43 | 0 | $8,780,385 | 0 |
| 2019 | 39 | 39 | 0 | $7,963,605 | 0 |
| 2018 | 37 | 37 | 0 | $7,466,020 | 1 |
| 2017 | 33 | 33 | 0 | $6,738,435 | 0 |
| 2016 | 30 | 30 | 0 | $6,125,850 | 30 |
| 2015 | 35 | 35 | 0 | $4,390,141 | 1 |
| 2014 | 33 | 33 | 0 | $4,115,431 | 0 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Madison County. Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 383 months. Annual table 1980 to 2025. County figures are the sum of the county's permit issuing places.
Madison CountyCounty permit office12 months to Aug 2026: 42 units, +5.0%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 4 |
| Units, 12 months to Aug 2026 | 42 |
| Change on the 12 months before | +5.0% |
| Of which one unit buildings | 40 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $20,267,523 |
| Change in value | +71.6% |
| Units, annual table, 2025 | 39 |
| Change on 2024 | +30.0% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 39 | 39 | 0 | $12,007,851 | 39 | 12 |
| 2024 | 30 | 28 | 0 | $7,381,675 | 30 | 12 |
| 2023 | 31 | 31 | 0 | $8,167,610 | 31 | 12 |
| 2022 | 52 | 52 | 0 | $13,138,320 | 52 | 12 |
| 2021 | 52 | 52 | 0 | $10,618,140 | 0 | 0 |
| 2020 | 43 | 43 | 0 | $8,780,385 | 0 | 0 |
| 2019 | 39 | 39 | 0 | $7,963,605 | 0 | 0 |
| 2018 | 36 | 36 | 0 | $7,351,020 | 0 | 0 |
| 2017 | 33 | 33 | 0 | $6,738,435 | 0 | 0 |
| 2016 | 30 | 30 | 0 | $6,125,850 | 30 | 12 |
| 2015 | 34 | 34 | 0 | $4,240,141 | 0 | 0 |
| 2014 | 33 | 33 | 0 | $4,115,431 | 0 | 0 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2013: months add to no months, annual table 34 units. Annual table only: no monthly record for this place and year.
- 2014: months add to no months, annual table 33 units. Annual table only: no monthly record for this place and year.
- 2015: months add to no months, annual table 34 units. Annual table only: no monthly record for this place and year.
- 2016: months add to no months, annual table 30 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2017: months add to no months, annual table 33 units. Annual table only: no monthly record for this place and year.
- 2018: months add to no months, annual table 36 units. Annual table only: no monthly record for this place and year.
- 2019: months add to no months, annual table 39 units. Annual table only: no monthly record for this place and year.
- 2020: months add to no months, annual table 43 units. Annual table only: no monthly record for this place and year.
- 2021: months add to 0, annual table 52 units. Only 3 of 12 months have a revised record.
US Census Bureau Building Permits Survey, Madison County (named MADISON COUNTY (1980 to 1988); Madison County Unincorporated Area (1991 to 2018); Madison County (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2004); the Bureau's final revised monthly records (Oct 2021 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 263 months. Annual table 1980 to 2025.
Lee townMunicipality12 months to Dec 2004: 2 units, -50.0%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Dec 2004) | 0 |
| Units, 12 months to Dec 2004 | 2 |
| Change on the 12 months before | -50.0% |
| Of which one unit buildings | 2 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $196,900 |
| Change in value | -42.1% |
| Units, annual table, 2016 | 0 |
| Change on 2015 | n/a |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2016 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2015 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2014 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2013 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2012 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2011 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2010 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2009 | 1 | 1 | 0 | $49,020 | 1 | 12 |
| 2008 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2007 | 2 | 2 | 0 | $303,475 | 2 | 12 |
| 2006 | 1 | 1 | 0 | $85,000 | 1 | 12 |
| 2005 | 3 | 3 | 0 | $319,400 | 3 | 12 |
The chart and the download carry every year from 2003; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2013: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2014: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2015: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2016: months add to no months, annual table 0 units. Annual table only: no monthly record for this place and year.
US Census Bureau Building Permits Survey, Lee town. Monthly: monthly figures as first published, before late reports and corrections, Jan 2003 to Dec 2004, 24 months. Annual table 2003 to 2016.
MadisonMunicipality12 months to Dec 2014: 0 units, n/a
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Dec 2014) | 0 |
| Units, 12 months to Dec 2014 | 0 |
| Change on the 12 months before | n/a |
| Of which one unit buildings | 0 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $0 |
| Change in value | n/a |
| Units, annual table, 2020 | 0 |
| Change on 2019 | n/a |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2020 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2019 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2018 | 1 | 1 | 0 | $115,000 | 1 | 12 |
| 2017 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2016 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2015 | 1 | 1 | 0 | $150,000 | 1 | 12 |
| 2014 | 0 | 0 | 0 | $0 | 0 | 11 |
| 2013 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2012 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2011 | 0 | 0 | 0 | $0 | 0 | 2 |
| 2010 | 0 | 0 | 0 | $0 | 0 | 9 |
| 2009 | 0 | 0 | 0 | $0 | 0 | 12 |
The chart and the download carry every year from 1991; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2015: months add to no months, annual table 1 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2016: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2017: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2018: months add to no months, annual table 1 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2019: months add to no months, annual table 0 units. Annual table only: no monthly record for this place and year.
- 2020: months add to no months, annual table 0 units. Annual table only: no monthly record for this place and year.
US Census Bureau Building Permits Survey, Madison. Monthly: monthly figures as first published, before late reports and corrections (Feb 1991 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2014), Feb 1991 to Dec 2014, 287 months. Annual table 1991 to 2020.
Sources on this page
- US Census Bureau: Building Permits Survey, place and county files from www2.census.gov/econ/bps: the South Region place files (annual table from 1980, monthly as first published from 1988, revised monthly records from 2013 and the current year's revised months) and the county annual table from 1990. Retrieved 2026-10-01. New privately owned residential buildings, housing units and construction value authorized, by structure size. Nominal dollars.
- Validated against the Bureau's annual table on every refresh and every build: where a place has a revised record for all twelve months, every month reported, and the Bureau built the annual figure from reports, the twelve months must add up to the annual table exactly or the build fails. The county table must equal the sum of its places for every county and year. Every other difference between a place's months and its annual table is published with the Bureau's reason, on the card and in the download.
- Imputed and missing months. A month the Bureau imputed because no report was received carries source code 5 and is shown in the chart's tooltip as imputed. From 2005 to 2021 the Bureau published monthly figures only for places in its monthly sample, so a place surveyed annually has no monthly figure for those years, and a county whose offices were all annual reporters has none either; from 2022 every place is surveyed monthly. Nothing is interpolated here. Annual figures are the Bureau's own annual table, never a sum made on this site.
- Sources and methods.
Download the data
Place monthly CSV (gzip) Place annual table CSV County monthly CSV County annual CSV Place registry CSV Annual differences CSV
One row per place and month with buildings, units and value by structure size, the basis of the figure and the Bureau's source code; the annual table with estimates and reported only columns; the same for counties; the place registry with every name the Bureau's files have used; and every place year whose months do not add up to the annual table, with the reason.