Housing units, buildings and construction value authorized by building permits in Calhoun County and each of its 4 permit issuing places, from the US Census Bureau Building Permits Survey. The county is the sum of its places. Consumer spending in Calhoun County.
Places in Calhoun County, latest figures
Sort any column; select a place to open its card. A county permit office issues permits for the unincorporated area, or for the whole county where no city issues its own.
| Area | Type | Latest month | Units, last 12 months | Change | One unit | Five or more | Value, last 12 months | Annual table | Units that year |
|---|---|---|---|---|---|---|---|---|---|
| Calhoun Balance of County | County permit office | Nov 1990 | 46 | -17.9% | 46 | 0 | $2,272,950 | 1989 | 51 |
| Calhoun County Unincorporated Area | County permit office | Aug 2026 | 20 | -25.9% | 20 | 0 | $4,132,963 | 2025 | 1 |
| ALTHA TOWN | Municipality | Sep 1988 | 1988 | 0 | |||||
| Blountstown | Municipality | Aug 2026 | 1 | -50.0% | 1 | 0 | $150,000 | 2025 | 3 |
County and places
Calhoun CountyCounty total12 months to Aug 2026: 21 units, -27.6%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 0 |
| Units, 12 months to Aug 2026 | 21 |
| Change on the 12 months before | -27.6% |
| Of which one unit buildings | 21 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $4,282,963 |
| Change in value | -22.9% |
| Units, annual table, 2025 | 4 |
| Change on 2024 | -85.7% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only |
|---|---|---|---|---|---|
| 2025 | 4 | 4 | 0 | $746,205 | 1 |
| 2024 | 28 | 28 | 0 | $5,221,096 | 3 |
| 2023 | 26 | 26 | 0 | $4,996,949 | 10 |
| 2022 | 40 | 40 | 0 | $7,283,168 | 40 |
| 2021 | 17 | 17 | 0 | $1,854,546 | 0 |
| 2020 | 14 | 14 | 0 | $1,527,273 | 0 |
| 2019 | 13 | 13 | 0 | $1,418,182 | 0 |
| 2018 | 12 | 12 | 0 | $1,309,091 | 0 |
| 2017 | 11 | 11 | 0 | $1,200,000 | 11 |
| 2016 | 12 | 12 | 0 | $1,665,000 | 12 |
| 2015 | 8 | 8 | 0 | $868,500 | 0 |
| 2014 | 8 | 8 | 0 | $868,500 | 8 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Calhoun County. Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025. County figures are the sum of the county's permit issuing places.
Calhoun Balance of CountyCounty permit office12 months to Nov 1990: 46 units, -17.9%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Nov 1990) | 3 |
| Units, 12 months to Nov 1990 | 46 |
| Change on the 12 months before | -17.9% |
| Of which one unit buildings | 46 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $2,272,950 |
| Change in value | -14.7% |
| Units, annual table, 1989 | 51 |
| Change on 1988 | -5.6% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 1989 | 51 | 51 | 0 | $2,432,080 | 51 | 12 |
| 1988 | 54 | 54 | 0 | $2,207,500 | 54 | 12 |
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Calhoun Balance of County. Monthly: monthly figures as first published, before late reports and corrections, Oct 1988 to Nov 1990, 26 months. Annual table 1988 to 1989.
Calhoun County Unincorporated AreaCounty permit office12 months to Aug 2026: 20 units, -25.9%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 0 |
| Units, 12 months to Aug 2026 | 20 |
| Change on the 12 months before | -25.9% |
| Of which one unit buildings | 20 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $4,132,963 |
| Change in value | -19.7% |
| Units, annual table, 2025 | 1 |
| Change on 2024 | -96.0% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 1 | 1 | 0 | $296,205 | 1 | 12 |
| 2024 | 25 | 25 | 0 | $4,771,096 | 0 | 0 |
| 2023 | 23 | 23 | 0 | $4,376,949 | 7 | 4 |
| 2022 | 26 | 26 | 0 | $4,998,168 | 26 | 12 |
| 2021 | 17 | 17 | 0 | $1,854,546 | 0 | 0 |
| 2020 | 14 | 14 | 0 | $1,527,273 | 0 | 0 |
| 2019 | 13 | 13 | 0 | $1,418,182 | 0 | 0 |
| 2018 | 12 | 12 | 0 | $1,309,091 | 0 | 0 |
| 2017 | 11 | 11 | 0 | $1,200,000 | 11 | 12 |
| 2016 | 12 | 12 | 0 | $1,665,000 | 12 | 12 |
| 2015 | 8 | 8 | 0 | $868,500 | 0 | 0 |
| 2014 | 8 | 8 | 0 | $868,500 | 8 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2015: months add to no months, annual table 8 units. Annual table only: no monthly record for this place and year.
- 2016: months add to no months, annual table 12 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2017: months add to no months, annual table 11 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2018: months add to no months, annual table 12 units. Annual table only: no monthly record for this place and year.
- 2019: months add to no months, annual table 13 units. Annual table only: no monthly record for this place and year.
- 2020: months add to no months, annual table 14 units. Annual table only: no monthly record for this place and year.
- 2021: months add to 0, annual table 17 units. Only 3 of 12 months have a revised record.
- 2022: months add to 16, annual table 26 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2025: months add to 28, annual table 1 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
US Census Bureau Building Permits Survey, Calhoun County Unincorporated Area (named CALHOUN CO. UNINC. AREA (N) (1980 to 1983); CALHOUN CO. UNINC. AREA (1984 to 1984); Calhoun Bal. of Co. (1987 to 1987); CALHOUN BAL. OF CO. (1985 to 1988); Calhoun County Unincorporated Area (1990 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 357 months. Annual table 1980 to 2025.
ALTHA TOWNMunicipalitySep 1988: 0 units
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Sep 1988) | 0 |
| Units, annual table, 1988 | 0 |
| Change on 1987 | n/a |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 1988 | 0 | 0 | 0 | $0 | 0 | 0 |
| 1987 | 0 | 0 | 0 | $0 | 0 | 0 |
| 1986 | 0 | 0 | 0 | $0 | 0 | 0 |
| 1985 | 0 | 0 | 0 | $0 | 0 | 0 |
| 1984 | 0 | 0 | 0 | $0 | 0 | 11 |
| 1983 | 0 | 0 | 0 | $0 | 0 | 12 |
| 1982 | 0 | 0 | 0 | $0 | 0 | 10 |
| 1981 | 0 | 0 | 0 | $0 | 0 | 12 |
| 1980 | 0 | 0 | 0 | $0 | 0 | 12 |
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, ALTHA TOWN (named ALTHA (N) (1980 to 1983); ALTHA (1984 to 1984); Altha Town (1987 to 1987); ALTHA TOWN (1985 to 1988) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections, Jan 1988 to Sep 1988, 9 months. Annual table 1980 to 1988.
BlountstownMunicipality12 months to Aug 2026: 1 units, -50.0%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 0 |
| Units, 12 months to Aug 2026 | 1 |
| Change on the 12 months before | -50.0% |
| Of which one unit buildings | 1 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $150,000 |
| Change in value | -63.7% |
| Units, annual table, 2025 | 3 |
| Change on 2024 | 0.0% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 3 | 3 | 0 | $450,000 | 0 | 0 |
| 2024 | 3 | 3 | 0 | $450,000 | 3 | 12 |
| 2023 | 3 | 3 | 0 | $620,000 | 3 | 12 |
| 2022 | 14 | 14 | 0 | $2,285,000 | 14 | 12 |
| 2021 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2020 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2019 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2018 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2017 | 0 | 0 | 0 | $0 | 0 | 10 |
| 2016 | 0 | 0 | 0 | $0 | 0 | 7 |
| 2015 | 0 | 0 | 0 | $0 | 0 | 0 |
| 2014 | 0 | 0 | 0 | $0 | 0 | 0 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2022: months add to 0, annual table 14 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2023: months add to 9, annual table 3 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2024: months add to 5, annual table 3 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2025: months add to 1, annual table 3 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
US Census Bureau Building Permits Survey, Blountstown (named BLOUNTSTOWN (1980 to 1988); Blountstown (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
Sources on this page
- US Census Bureau: Building Permits Survey, place and county files from www2.census.gov/econ/bps: the South Region place files (annual table from 1980, monthly as first published from 1988, revised monthly records from 2013 and the current year's revised months) and the county annual table from 1990. Retrieved 2026-10-01. New privately owned residential buildings, housing units and construction value authorized, by structure size. Nominal dollars.
- Validated against the Bureau's annual table on every refresh and every build: where a place has a revised record for all twelve months, every month reported, and the Bureau built the annual figure from reports, the twelve months must add up to the annual table exactly or the build fails. The county table must equal the sum of its places for every county and year. Every other difference between a place's months and its annual table is published with the Bureau's reason, on the card and in the download.
- Imputed and missing months. A month the Bureau imputed because no report was received carries source code 5 and is shown in the chart's tooltip as imputed. From 2005 to 2021 the Bureau published monthly figures only for places in its monthly sample, so a place surveyed annually has no monthly figure for those years, and a county whose offices were all annual reporters has none either; from 2022 every place is surveyed monthly. Nothing is interpolated here. Annual figures are the Bureau's own annual table, never a sum made on this site.
- Sources and methods.
Download the data
Place monthly CSV (gzip) Place annual table CSV County monthly CSV County annual CSV Place registry CSV Annual differences CSV
One row per place and month with buildings, units and value by structure size, the basis of the figure and the Bureau's source code; the annual table with estimates and reported only columns; the same for counties; the place registry with every name the Bureau's files have used; and every place year whose months do not add up to the annual table, with the reason.